A first order does not need to be a bulk commitment. Our MOQ is tiered by style: our own blocks (your prints and embroidery included) start at 30 pieces, special patterns at 100 per style per colour, and complex constructions at 200. Split the run across colours and sizes as you need, validate demand on real production stock, collect buyer feedback, and reorder only the winners from reserved fabric. This is the exact workflow we run for e-commerce clients every week.
Planning the run is only half of it — OEM vs ODM vs CMT decides who supplies what, and the cost breakdown shows where a small order's money actually goes.
The Three MOQ Tiers, and When Each One Fits
| Tier | MOQ | What qualifies | Best for |
|---|---|---|---|
| Blanks / base styles | 30 pieces | Stock fabric, stock colours, no decoration — tees, hoodies and crewnecks from our base-style library | First market tests, merch pilots, live-selling flash styles |
| Standard custom | 200 pcs / style / colour | Your fabric direction, colours, prints and labels on proven blocks | Styles that tested well and now carry your brand |
| Complex construction | 200 pcs / style | Lined dresses, suits, outerwear — multi-panel, multi-process work | Core styles once demand is proven |
Below a few hundred pieces, custom fabric becomes the constraint, not the sewing line: mills sell fabric by the metre in minimum lots, and a cut table filled with a 100-piece lay costs more per piece than the same style at 500. That is exactly why blanks run on stock fabric — the 30-piece tier works because nothing waits on a dye lot.
The First-Order Workflow
| Stage | What happens | Typical timeline |
|---|---|---|
| 1. Submit references | Send sketches, sample photos or a link to a style you like | Day 0 |
| 2. Quotation | Get unit price by quantity tier, MOQ and sampling fee within 24h | Day 1 |
| 3. Sampling | First sample for fit, fabric and workmanship confirmation | Days 5–7 |
| 4. Bulk 30–500 pcs | Production after sample approval, inline QC checks | Days 10–15 |
| 5. Market test | List online, run ads, collect sell-through data for 2–4 weeks | Weeks 4–8 |
| 6. Reorder winners | Restock best-selling colours/sizes from reserved fabric in 20–35 days | Rolling |
How to Split the Run Across Colours and Sizes
Do not put the whole run into one basket. A typical split that produces usable data:
- Blanks, 30–50 pcs — 2 colours × 15–25 pcs: enough to read conversion, small enough that a slow colour costs almost nothing
- Custom, 200 pcs — 2 colours × 100 pcs for a clean comparison; 3 colours when the style targets trend-driven buyers
- Size curve 1-2-2-1 (S-M-L-XL) — matching standard e-commerce size distribution
One word of caution: 3+ colours on a first custom order usually spreads the data thin. If none of them clearly wins, the problem is usually the style, not the colour.
What a First Order Actually Costs
For a mid-weight custom cotton hoodie at 500 pieces, a realistic budget looks like this:
- Sampling: $50–120 (credited back against the bulk order)
- Unit cost: fabric and labour dominate; we quote 200 / 500 / 1,000 / 2,000-piece tiers side by side so you can see where the next saving sits
- Shipping (express for speed): $2–6 per piece depending on destination
- Blanks run lower still: stock fabric and stock colours mean no sampling wait and the best unit price at the smallest quantity
The structure matters more than the number: on the first order, pattern, sample and screen fees are all absorbed once, so every later batch prices lower. We archive the pattern, fabric spec and dye lot, so the reorder process takes days of communication instead of weeks.
When to Scale Up
Scale when one colour/size sells through 70%+ within 3–4 weeks at full price. At that point a reorder of 1,000–2,000 pcs drops the unit cost meaningfully — the biggest single drop sits between the first order and the second tier — and the pattern is already digitized, so no resampling is needed. Reserve 30–50% of the same dye lot on the first order and the reorder ships in 20–25 days.
This model works across the range: tees, hoodies and knitwear basics start at 30 pieces as blanks; shirts, trousers, activewear and kids' lines at 200; dresses, suits and outerwear at 500. See the full process on our e-commerce manufacturing page, browse product categories, or send us your first style for a quote within 24 hours.
Need the whole range rather than one category? Download the 2026 product catalogue (PDF) — 19 apparel categories and 13 footwear series, with MOQ and lead times for each.
Have a style to produce?
Send your reference, quantity and destination — we reply with a full quote within 24 hours.
Get a Quote Open the catalogue