Most first orders are lost on payment terms, not price. The buyer is afraid of sending money into nothing; the factory is afraid of sewing a run nobody collects. The 30/70 split exists because it splits that fear in half — but the Incoterm you choose quietly decides who pays for freight, insurance and duty, and that number is often larger than the difference you negotiated on unit price.
Payment is only half the risk — the factory checks come first, and the landed-cost breakdown shows what the deposit is actually covering.
Why 30/70 Is the Default
30% deposit, 70% before shipment. The deposit covers fabric and trims, which the factory must buy up front — on a first order that is most of the cash. The balance is released when goods are packed and inspected, before the container leaves. Neither side is fully protected, which is exactly why it survives: both sides carry half the risk.
Variations you will meet:
- 30/70 — standard for first orders and most repeat orders.
- 50/50 — common for small orders or custom fabric that the factory cannot resell.
- 30/40/30 — deposit, after production, after inspection; used on larger orders.
- Net 30 after delivery — only for established accounts with history. A new supplier offering this is usually a trading company with margin to absorb risk.
The Four Incoterms You Will Actually See
| Term | Export clearance | Main freight | Insurance | Import duty and clearance | Risk passes to you |
|---|---|---|---|---|---|
| EXW (Ex Works) | You | You | You | You | At the factory door |
| FOB (Free On Board) | Factory | You | You | You | When goods are on board the vessel |
| CIF (Cost, Insurance, Freight) | Factory | Factory | Factory (minimum cover) | You | When goods are on board the vessel |
| DDP (Delivered Duty Paid) | Factory | Factory | Factory | Factory | At your delivery address |
Two practical warnings. EXW looks cheapest and rarely is: you become the exporter of record in a country where you have no entity, and the forwarder charges you retail rates. CIF insurance is minimum cover (Institute Cargo Clauses C) — it does not pay for water damage or partial loss. If the goods matter, buy all-risk cover yourself.
FOB is the sane default for a first order: the factory handles export paperwork, you control the forwarder and can see the real freight cost instead of a marked-up number inside a CIF quote.
What a Deposit Actually Protects You From
A deposit does not protect you. The documents around it do. Before transferring, have four things:
- A contract or PI with the company's full legal name, matching the bank account name exactly. A payment to a personal account is not a business transaction.
- Bank details on company letterhead, verified by a second channel (phone call to a number you found yourself, not one in the email). Business email compromise on apparel orders is common and always arrives as "our bank details have changed".
- Inspection rights written in — third-party inspection before the balance is released, at your cost, with a named standard (AQL 2.5).
- A named ship date with a remedy — even a simple "delay beyond 10 days gives the buyer the right to cancel" changes behaviour.
Payment Methods, Ranked by Cost and Safety
| Method | Cost | Buyer protection | When to use |
|---|---|---|---|
| Bank transfer (T/T) | $15–50 per transfer | None — relies on contract | Standard for deposits and balances |
| Letter of credit (L/C) | 0.5–1.5% of value plus bank fees | Strong, if documents are exact | Orders above roughly $50,000 |
| PayPal / card | 3–4.5% | Strong, with chargeback rights | Sample fees and small orders |
| Escrow platform | 1–3% | Medium — depends on inspection terms | First order with a new supplier |
On a $4,000 sample-and-first-order budget, paying 3% for card protection is cheap insurance. On a $60,000 bulk order, an L/C is worth the paperwork — but only if the document list is agreed line by line, because a single mismatched description stops payment.
Currency and the Quiet 2%
Quotes are usually in USD or RMB. If your bank converts, you pay a spread of roughly 1–3% on top of the rate you see on Google. Ask whether the quote is fixed for 30 days, and whether a 3% RMB move reopens the price. Factories that quote in RMB and convert at payment time are not being dishonest — they are passing on exchange risk, and you should know it is in the number.
What We Ask For, and Why
30% deposit to start fabric, 70% after inspection and before shipment, FOB Chongqing by default. Sample fees are quoted separately and credited against the bulk order above a stated quantity. For orders where a buyer wants more protection, we work with third-party inspection and escrow — the cost is theirs, the schedule is ours.
If you are comparing quotes, check that each one uses the same Incoterm before you compare the number — a CIF quote and an EXW quote for the same garment are not the same offer. See how cross-border shipping is planned, read the FBA and freight guide, or check the FAQ on payment and lead times. Ask for a quote with the Incoterm stated and we will quote both FOB and DDP so you can compare landed cost.
Need the whole range rather than one category? Download the 2026 product catalogue (PDF) — 19 apparel categories and 13 footwear series, with MOQ and lead times for each.
Have a style to produce?
Send your reference, quantity and destination — we reply with a full quote within 24 hours.
Get a Quote Open the catalogue